Measured Building Surveys
Highly accurate surveys for residential and commercial properties.
Enquire
Professional measured building surveys, planning drawings and architectural services for homeowners, architects, developers and commercial clients throughout the UK.

MZ Surveying UK provides professional measured building surveys and architectural drawing services throughout the UK.
The company is led by a surveyor holding a Bachelor's Degree in Architectural Studies and a Master's Degree in Building Surveying, with over 5 years of industry experience delivering accurate measured surveys and high-quality technical drawings.
We pride ourselves on precision, fast turnaround times and exceptional customer service.
A full suite of measured survey and drawing services, delivered with architectural precision.
Highly accurate surveys for residential and commercial properties.
EnquireProfessional CAD floor plans suitable for planning, design and construction.
EnquireAccurate external elevation drawings for planning applications and design work.
EnquireDetailed building section drawings created from measured surveys.
EnquireProfessional planning application drawings prepared for local authority submissions.
EnquireDetailed existing building plans for renovation and development projects.
EnquireEvery survey and drawing is prepared personally by a degree-qualified surveyor — combining architectural understanding with technical precision.
Share your project details and requirements.
A tailored fixed-fee proposal within 24 hours.
Accurate measurements taken on site using laser equipment.
Detailed drawings produced in professional CAD.
Delivered in PDF and DWG, ready for use.
A glimpse of our measured surveys, floor plans and CAD drawings prepared for clients across the UK.
"MZ Surveying UK produced our planning drawings incredibly quickly. Excellent communication and extremely accurate."
"Working with MZ has been a pleasure. The measured survey was flawless and delivered ahead of schedule."
"Great value, professional service and precise CAD output. Will absolutely use again for our next development."
Every project is different. Cost depends on property size, complexity and location. Contact us for a fixed-fee quote within 24 hours.
Most residential surveys are completed within 3–7 working days from the site visit, with faster turnaround available on request.
We provide nationwide coverage across the UK, from London and the South East to the Midlands, North and Scotland.
Yes — we prepare professional planning application drawings suitable for submission to local authorities.
Absolutely. We work with offices, retail units, industrial buildings and mixed-use developments of any scale.
Tell us about your project — we'll come back within 24 hours with a tailored fixed-fee quotation.